Summary
Set 1
Exercise 1
Exercise 2
Exercise 3
Exercise 4
Exercise 5
Set 2
Exercise 1
Exercise 2
Exercise 3
Exercise 4
Exercise 5
Set 3
Exercise 1
Exercise 2
Exercise 3
Exercise 4
Exercise 5
Exercise 6
Gallery
Schedule
Ejercicio 1.2
Training Exercise Data
Exercise:
Ejercicio 1.2
Start date:
14/01/2009
End date:
15/01/2009
Place:
Ría de Arousa
Specifications:
Pdf
Map Services
Google Earth
WMS
SHP
Position layer
kml
wms
/
kml
zip
Events layer
kml
wms
zip
Raw layer
kml
zip
Position of drifters
Refresh in
5
min.
Log
13/01/2009
-
10:00
. The buoys and Trimble are charged. The Leds are tested.
The buoys are marked with telephone and date.
The buoys are tested. All calls are put down and a correct sms, with the position, is received.
The buoy number 7 is added to the listed buoys.
The buoys 1 and 2 will be released with big drogues and buoys 3,5,6,7 with small drogues, due to the lack of big drogues, so during the last mission some buoys had it drogue stolen.
14/01/2009
-
08:20
. The buoys are released in 8º48.1983’W, 42º 35.7616’ N. Afterwards, the buoy 5 fails so it is picked up.
-
10:54
. Buoys 2, 7,got caught in a raft
-
11:09
. Buoy 1 got caught in a raft.
-
13:20
. Buoys 1, 2 were released again.8º49.6882’W,42º 35.1263’N
-
13:32
. Buoy 7 was released again. 8º50.0818’W, 42º 35.4730’N.
15/01/2009
-
10:20
. The buoy 2 is picked up in a raft, 8º48.197’W, 42º 35.763’ N
-
10:40
. The buoy 1 is picked up in a raft, 8º49.5861’W, 42º 36.5753’ N
-
10:55
. The buoy 3 is picked up sailing 8º50.829’W, 42º 36.6859’ N
-
11:15
. The buoy 6 is picked up sailing 8º47.9913’W, 42º 35.9029’ N
-
11:35
. The buoy 7 is picked up in a raft,8º49.726’W, 42º 35.133’ N
2024 ©
INTECMAR